Construction cost: $11 M
Area: 42,000 sf
Completed: 2006
LEED Platinum Certified
2007 Honor Award for Sustainable Design
Boston Society of Architects
2007 FinalistExcellence in Design Awards
Environmental Design and Construction
2007 Build New England Merit Award
AGC of Massachusetts
2007 Go Green Award
City of Cambridge
2008 Preservation Award
Cambridge Historical Commission
2008 Design Merit Award
AIA New England
2008 Green Design Award
College Planning & Management
Blackstone Station was originally a coal-fired electricity plant. Harvard University acquired the site, which now generates steam for University-wide use. While the main plant will continue in that capacity, the historic masonry outbuildings have been restored and sensitively transformed into offices and workshops for the University Operations Services (UOS).
more
|